Partial demolition and reconfiguration of the existing space requiring extensive planning, scheduling and organization to maintain the residents’ access.
Partial demolition and reconfiguration of the existing space requiring extensive planning, scheduling and organization to maintain the residents’ access.
A 8,500 sq. ft. ground up construction for a full service restaurant in Sherwood, OR featuring a decorative dining room and bar.
Ground up project for a 9,100 sq. ft. CMU and Prefab Metal Building on a 1.6 acre lot with new underground utilities, extensive landscaping, retention ponds, hardscape walkways and pavement for parking.The interior buildout included new mechanical, EMS and electrical systems, restrooms, an office, store room, new interior wall finishes and infrastructure for new coolers […]
A ground-up build including red steel beam construction, reinforced concrete floor, steel studs, and complete building wrap and finish.